WAPPENSHALL NOT SO SOGGY!

Wappenshall basin was pumped out and the team of William, Phil and Dave put all the formwork and steels back into position. It was a bit muddy, but the job was done! Steve stuck to the task of bricking up the edges of the new doorway through to the toilet block too. All in all a good day’s work.

William, Dave and Phil lift the final section into place.
A very muddy William retires at the end of the day – a job well done!
Steve puts his bricklaying skills to good use.

You may also like...